Adding More DC Power
More DC power is being added to accommodate growth to the Veraz Control Switch. Before the new power cables can be run from the BDF (battery distribution frame), the preliminary work of lacing in the waxed cord must be completed. Then as the new cables are laid down, they are sewed by hand so that all cables are neatly tied down. No cable cross-overs are allowed!