New 60 Hudson Colo Site Date: 08/06/2008 Completed Dec. 1, 2008, Sirius Telecom has added another 7,000 square feet of prime colocation space at 60 Hudson Street, New York. With brand new UPS facilities and new generator located on the first floor, this is a premier colo site, with intra-buliding connectivity to every major tenant including TelX, FiberNet, Level 3, Global Crossing, Qwest, Verizon, AT&T, Tata, RCN, MetCom, and Ascent.
750 KW Diesel Generator Date: 08/08/2007 The new Sirius Telecom diesel generator is ready to provide backup power with an ATS (automatic transfer switch) integrated between commercial power and generator power.
Ceiling Removal Underway Date: 02/29/2008 Renovations basically start at the top and work down. Here the ceiling removal is underway. All new ceiling tiles, light fixtures and supports will be replaced.
Leibert 20 Ton HVAC Units Date: 02/29/2008 Here, three Leibert 20 ton air conditioning units are undergoing complete refurbishment, maintenance, testing and turn up.
Leibert HVAC Date: 02/29/2008 Each Leibert HVAC unit gets top to bottom attention.
New 150 KVA Emerson UPS Date: 05/19/2008 Sirius colo site at 60 Hudson NYC has a reinforced floor to accommodate two 150 KVA UPS units. Pictured here is the first Emerson unit delivered to the site.
Additional Emerson UPS Cabinets Date: 05/19/2008 The initial 150 KVA system was delivered brand new in 2008.
Emerson UPS System Positioned for Installation Date: 05/19/2008 Due to the weight of the Emerson UPS systems, because every cabinet has batteries for emergency backup power, a steel foundation is installed on the raised, reinforced flooring first. Each cabinet is carefully hoisted and then set into position. Only after all the cabinets are connected together and anchored, is the immense task of wiring begun. This job took over four months to complete.
Emerson UPS Suspended in Air by Hoists Date: 05/19/2008 Jacoby Electric, union electricians with vast installation experience at 60 Hudson NYC, gingerly move the new Emerson UPS cabinet into it's final position.
First Emerson UPS Cabinet Moved In Date: 05/19/2008 Jacoby Electric along with DP Facilities work to position the first of several cabinets of the Emerson 150 KVA UPS system.
New UPS Cabinet Wrapped and Protected for Move In Date: 05/19/2008 New UPS unit must look new so it was wrapped to protect it's surfaces.
Breaker Panel From UPS System Date: 06/18/2008 This is an early picture of power distribution breaker panels located throughout the new Sirius colo facility at 60 Hudson, suite 1213. When finished, it will have 20 and 30 amp breakers, capable of delivering 110 volt service as well as 208 volt service.
Emerson UPS Completely Positioned, Power Output Underway Date: 06/18/2008 Now that the Emerson UPS system is anchored to the raised and steel reinforced floor, work will commence on the power output to be connected to the breaker distribution panels located throughout the Sirius colo facility.
Emerson UPS System Wiring Date: 05/19/2008 The long process of positioning and anchoring the UPS cabinets completed, the next step is to wire the internal battery strings together as well as connect all the cabinets together.
Ceiling Removed for Electical Installation Date: 06/18/2008 Power output from UPS system in this picture is about to be run through conduits built in the ceiling to distribution panels conveniently located throughout the colo facility.
Another Breaker Panel Date: 06/18/2008 This distribution panel is located in the colo facility designed for cages. 5 x 10 and 10 x 10 cages will be constructed adjacent to this panel. Several telecom carriers have already contracted for 10 x 10 cages to colocate their next-gen switches in the site.
Transformer Installed Suite 1215 Date: 06/18/2008 We can't quite figure out why we had to install this, but we paid big bucks for after being told it was a must have. Besides, we thing our competitors might have one so we didn't want to be left out. We were told not to touch it once it is powered up. If you know what it is, please email us and we'll send you a new Sirius Telecom coffee cup, which is brand new, just like this thing.
New Transformer Date: 06/18/2008 We're pretty sure this is a 480V to 208 volt, three phase transformer.
Headless Electician Date: 06/19/2008 If only this apprentice electrician hadn't pressed the fast forward button on the lift, because he had no idea the incredible speed of 50 mph could be achieved.
East Side Vault Room Date: 06/19/2008 Incoming conduit connectivity
Above Ceiling Conduits Date: 06/19/2008
May 2008 023 Date: 06/19/2008
May 2008 024 Date: 06/19/2008
May 2008 025 Date: 06/19/2008
Diesel Fuel Room For Sirius Telecom Generator Date: 06/19/2008 After the tragedy of 9/11, severe limitations on fuel storage above the ground floor were enacted for all buildings in New York City. The result is that many legacy generators for telecom sites only have limited operating backup time due to the constraints of fuel. Hand carrying fuel to resupply a generator in a power outage or other emergency is typically not practical due to weight constraints and the number of floors required to be climbed via stairs. The Sirius solution was to locate the generator and a separate fuel facility which could be resupplied at ground level.
May 2008 030 Date: 06/19/2008
May 2008 031 Date: 06/19/2008
May 2008 034 Date: 06/19/2008
May 2008 035 Date: 06/19/2008
May 2008 036 Date: 06/19/2008
Raised Steel Platform for UPS Systems Date: 06/19/2008 This picture shows the incredible infrastructure built to accommodate present and future UPS systems.
150 KVA Emeson UPS System Ready for Testing Date: 05/19/2008 After four months of installation, the Emerson UPS is now ready for testing. The batteries are installed, the electronics have been tested, and once a thorough test plan is completed, the UPS will be activated and thus put into service.
UPS Activated Date: 05/19/2008 All testing and turn up procedures are completed. Now that the UPS is activated, air conditioning units must be operational 24 x 7.
Dec. 1, 2008 of Newly Commissioned Colo Space Date: 08/06/2008 This photo will be outdated within a week as several carriers and enterprise clients have signed up for space at this site and have already started shipping racks, servers and network gear to suite 1213 for installation.
Designated Cabinet Colo Area Date: 08/06/2008 In this area of the newly commissioned Sirius colo site, suite 1213 60 Hudson building, Sirius will install 42 RU self contained lockable cabinets, capable of housing 36 inch deep servers or other nework/telecom gear. Sirius will also offer autonomous half cabinets custom applications. All cabinet clients will enjoy 24 x 7 secured access to the site. 60 Hudson and Sirius Telecom offer a high degree of security. Photo ID and credentials are necessary to enter the building itself, and an additional card key is required to enter suite 1213. There is video surveillance throughout the building as well as the Sirius colo site. Additionally, Sirius has technicians on site.
Advanced Fire Suppression System Date: 08/06/2008 Although we installed a pre-action fire suppression system which is also tied into the 60 Hudson fire life safety system, we couldn't resist the hardware salesman downstairs who told us we could be our own one-man fire department with the nifty apparatus. Although tempted to test it on each other during late nights of construction, we resisted and this excellent fire-fighting tool diligently ready to come to the rescue.
Suite 1213 8_7_2008 007 Date: 08/06/2008
New Colocation Cage Date: 11/24/2008 A newly completed colocation cage in suite 1213. This 10 x 10 cage will soon be occupied by a carrier client who will be locating network gear and telecom equipment.
[-]